Loading...
Changeset: 148024178
Bau soll nun erst 2033 abgeschlossen sein
Closed by jodd
Tags
created_by | JOSM/1.5 (18969 de) |
---|---|
source | https://www.hessenschau.de/wirtschaft/kostenexplosion-riederwaldtunnel-in-frankfurt-wird-eine-milliarde-euro-teurer-v2,riederwaldtunnel-kosten-104.html |
Discussion
Ways (1-20 of 27)
- 1
- 2
- A 66 (46114410), v20
- 46114412, v60
- Riederwaldtunnel (53208468), v50
- 53208469, v59
- 107299388, v17
- 124326099, v18
- 124326100, v16
- 124326101, v16
- 173798828, v15
- 173798829, v12
- 173798830, v20
- Riederwaldtunnel (173798832), v23
- 173798834, v16
- A 66 (173798835), v18
- 173798837, v14
- A 66 (173798838), v18
- 173798839, v15
- 173798840, v18
- A 66 (173798841), v14
- 173799143, v55
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |