Loading...
Way: 1009582335
Version #1
construction of the improved cycleway has been abandoned; surface has deteriorated in most unimproved places
- Edited by jpennycook
- Changeset #114615651
Tags
bicycle | permissive |
---|---|
bridge | yes |
foot | permissive |
highway | path |
layer | 1 |
lit | no |
segregated | no |
smoothness | very_bad |
source | survey |
surface | dirt |
Part of
3 relations
- Relation Blackwater Valley Path (105734)
- Relation Blackwater Valley Multi-User Path (2867329)
- Relation Blackwater Valley Blue Route (8113894) (as proposed)
Nodes
2 nodes
- 9315185624 (part of way 591896967)
- 9315185625 (part of way 1009582334)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |