Loading...
Way History: Connecticut River Main Line (Controlled Siding) (1036425696)
Version #3
updated owner and operator, fixed few pass and frt speeds that were missing.
- Edited by MetalCascade
- Changeset #145815983
Tags
electrified | no |
---|---|
gauge | 1435 |
maxspeed | 30 mph |
maxspeed:freight | 25 mph |
name | Connecticut River Main Line (Controlled Siding) |
operator | Berkshire and Eastern Railroad |
owner | Massachusetts Department of Transportation |
railway | rail |
railway:atc | no |
railway:ctc | yes |
railway:ptc | no |
railway:track_ref | CS |
ref | CRM |
usage | main |
Nodes
Version #2
added PTC/CTC information.added passenger and freight speeds. added Mile post location
- Edited by MetalCascade
- Changeset #135878645
Tags
electrified | no |
---|---|
gauge | 1435 |
maxspeed | 30 mph |
maxspeed:freight | 25 mph |
name | Controlled Siding |
operator | Pan Am Southern |
railway | rail |
railway:ctc | yes |
railway:ptc | no |
railway:track_ref | CS |
service | siding |
Nodes
Version #1
Added the new track at Greenbush station and moved the Amtrak relations over to that track
Tags
electrified | no |
---|---|
gauge | 1435 |
railway | rail |
Nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |