Way History: 200 (104887407)
Version #49
update progress
- Edited by RobertH-PUM
- Changeset #151516086
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:83.35%/01.04.2024 82.20%/31.01.2024 82%/21.12.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #48
update progress
- Edited by RobertH-PUM
- Changeset #146954213
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:82.20%/31.01.2024 82%/21.12.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #47
update progress
- Edited by RobertH-PUM
- Changeset #145375915
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:82%/21.12.2023 81.05%/28.11.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #46
update status
- Edited by RobertH-PUM
- Changeset #144561453
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:81.05%/28.11.2023 80%/20.10.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #45
update progress
- Edited by RobertH-PUM
- Changeset #142874766
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:80%/20.10.2023 78.10%/28.09.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #44
update progress
- Edited by RobertH-PUM
- Changeset #141872896
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:78.10%/28.09.2023 77.50%/28.08.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #43
update progress
- Edited by RobertH-PUM
- Changeset #140488060
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:77.50%/28.08.2023 76.50%/01.07.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #42
update status
- Edited by RobertH-PUM
- Changeset #138756777
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:76.50%/01.07.2023 74.90%/31.05.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #41
update progress
- Edited by RobertH-PUM
- Changeset #137818773
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:74.90%/31.05.2023 74.05%/01.05.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #40
update progress
- Edited by RobertH-PUM
- Changeset #136281871
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:74.05%/01.05.2023 73.55%/01.04.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #39
update progress
- Edited by RobertH-PUM
- Changeset #134823947
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:73.55%/01.04.2023 73.05%/01.03.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #38
update progress
- Edited by RobertH-PUM
- Changeset #133782688
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:73.05%/01.03.2023 70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #37
update progress
- Edited by RobertH-PUM
- Changeset #130517472
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:70.90%/01.12.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #36
update progress
- Edited by RobertH-PUM
- Changeset #129088624
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:68.10%/01.11.2022 66.80%/01.10.2022 65.70%/01.09.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #35
update progress
- Edited by RobertH-PUM
- Changeset #127490174
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:66.80%/01.10.2022 65.70%/01.09.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #34
update progress
- Edited by RobertH-PUM
- Changeset #126427814
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:65.70%/01.09.2022 63.78%/01.07.2022 61.06%/01.06.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #33
corected
- Edited by RobertH-PUM
- Changeset #125021444
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | construction |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:63.78%/01.07.2022 61.06%/01.06.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #32
update status
- Edited by RobertH-PUM
- Changeset #124794298
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:63.78%/01.07.2022 61.06%/01.06.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #31
update progress
- Edited by RobertH-PUM
- Changeset #122115643
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:61.06%/01.06.2022 54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #30
update status
- Edited by RobertH-PUM
- Changeset #116140721
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI,progress:54.28%/01.01.2022 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #29
rail speed
- Edited by infrastructure
- Changeset #114833949
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:53.50%/15.11.2021 48.20%/09.08.2021 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #28
update status
- Edited by RobertH-PUM
- Changeset #114323742
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:53.50%/15.11.2021 48.20%/09.08.2021 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #27
update status
- Edited by RobertH-PUM
- Changeset #109409912
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:48.20%/09.08.2021 47.22%/25.06.2021 42.80%/17.05.2021 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #26
corrected
- Edited by RobertH-PUM
- Changeset #106978308
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:47.22%/25.06.2021 42.80%/17.05.2021 37.81%/23.12.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #25
corrected
- Edited by RobertH-PUM
- Changeset #106978204
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:47.22%/25.06.2021 42.80%/17.05.2021 37.81%/23.12.2020 13.20%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #24
update status
- Edited by RobertH-PUM
- Changeset #106968025
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:47.22%/25.06.2021 42.80%/17.05.2021 38.45%/23.01.2021 37.81%/23.12.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #23
update status
- Edited by RobertH-PUM
- Changeset #104885707
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:42.80%/17.05.2021 38.45%/23.01.2021 37.81%/23.12.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #22
corrected
- Edited by RobertH-PUM
- Changeset #103018631
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:gnt | no |
railway:lzb | no |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:38.45%/23.01.2021 37.81%/23.12.2020 36.41%/18.11.2020 32.75%/18.08.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #21
Fixing Section 200
- Edited by RobertH-PUM
- Changeset #100271068
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
name | 200 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:38.45%/23.01.2021 37.81%/23.12.2020 36.41%/18.11.2020 32.75%/18.08.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #20
update status
- Edited by RobertH-PUM
- Changeset #98248148
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:38.45%/23.01.2021 37.81%/23.12.2020 36.41%/18.11.2020 32.75%/18.08.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #19
update status
- Edited by RobertH-PUM
- Changeset #96350316
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:37.81%/23.12.2020 36.41%/18.11.2020 32.75%/18.08.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #18
update status
- Edited by RobertH-PUM
- Changeset #94398482
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:36.41%/18.11.2020 32.75%/18.08.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #17
update progress
- Edited by RobertH-PUM
- Changeset #89587046
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:32.75%/18.08.2020 29.19%/03.07.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #16
update status
- Edited by RobertH-PUM
- Changeset #87505447
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:29.19%/03.07.2020 28.20%/18.05.2020 25.39%/28.02.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #15
update status
- Edited by RobertH-PUM
- Changeset #85390156
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:28.20%/18.05.2020 25.39%/28.02.2020 23.55%/17.01.2020 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #14
Update status
- Edited by RobertH-PUM
- Changeset #81926603
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:25.39%/28.02.2020 23.55%/17.01.2020 18.3%/18.10.2019 17.95%/17.09.2019 15.23%/28.08.2019 12.43%/18.06.2019 8.66%/14.05.2019 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #13
Update status
- Edited by RobertH-PUM
- Changeset #79744802
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:23.55%/17.01.2020 18.3%/18.10.2019 17.95%/17.09.2019 15.23%/28.08.2019 12.43%/18.06.2019 8.66%/14.05.2019 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #12
ETCS planned to implement
- Edited by RobertH-PUM
- Changeset #76219623
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:18.3%/18.10.2019 17.95%/17.09.2019 15.23%/28.08.2019 12.43%/18.06.2019 8.66%/14.05.2019 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #11
Update status
- Edited by RobertH-PUM
- Changeset #76152267
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:18.3%/18.10.2019 17.95%/17.09.2019 15.23%/28.08.2019 12.43%/18.06.2019 8.66%/14.05.2019 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #10
Status update
- Edited by RobertH-PUM
- Changeset #74590185
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:17.95%/17.09.2019 15.23%/28.08.2019 12.43%/18.06.2019 8.66%/14.05.2019 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #9
Update status
- Edited by RobertH-PUM
- Changeset #73848876
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:15.23%/28.08.2019 12.43%/18.06.2019 8.66%/14.05.2019 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #8
Update
- Edited by RobertH-PUM
- Changeset #71556796
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:12.43%/18.06.2019 8.66%/14.05.2019 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #7
Tagging of train protection systems in Romania
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:8.66%/14.05.2019 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #6
Update status
- Edited by RobertH-PUM
- Changeset #70334359
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:8.66%/14.05.2019 7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #5
Added status
- Edited by RobertH-PUM
- Changeset #68225862
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
status | AC,builder:FCC+ASTALDI+CONTRAS_Y_VENTAS,progress:7.71%/18.02.2019 |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #4
railway details
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
passenger_lines | 2 |
railway | rail |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #3
v/max Rumänien
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
railway | rail |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #2
Tracks
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 50 |
gauge | 1435 |
layer | 1 |
railway | rail |
usage | main |
voltage | 25000 |
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Version #1
railways in Deva
Tags
Nodes
2 nodes
- 1209500632 (part of way 200 (104887394))
- 1209500477 (part of way 200 (1086988783))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |