Loading...
Way: 1165165601
Version #9
Determine whether road construction is now completed
- Edited by ShinyGoldfish
- Changeset #150777841
Tags
bicycle | designated |
---|---|
check_date | 2024-05-02 |
construction | cycleway |
cycleway:surface | asphalt |
foot | designated |
footway:surface | asphalt |
highway | construction |
lit | yes |
oneway | yes |
segregated | yes |
source | survey |
surface | paved |
Nodes
11 nodes
- 10837758991 (part of ways 245818192 and 1165165598)
- 2529343436
- 2529343450
- 6832340850
- 2529343438
- 6832558364
- 2529343464
- 2529343446
- 2529343442
- 761365383
- 2278261006 (part of ways 218591187 and 729302607)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |