Loading...
Way: Capital Boulevard (1176513116)
Version #2
Extended trunk routes to downtown
- Edited by Joseph R P
- Changeset #146788695
Tags
NHS | yes |
---|---|
bicycle | discouraged |
foot | discouraged |
hgv | designated |
hgv:national_network | yes |
highway | trunk |
lanes | 7 |
maxspeed | 45 mph |
name | Capital Boulevard |
oneway | yes |
ref | US 1;US 401 |
source:hgv:national_network | Title 23: Highways Part 658 http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&rgn=div5&view=text&node=23:1.0.1.7.33&idno=23 |
surface | asphalt |
tiger:cfcc | A25 |
tiger:county | Wake, NC |
tiger:name_base | Capital |
tiger:name_type | Blvd |
turn:lanes | left|left|through|through|through|through|right |
Part of
4 relations
- Relation 1 (1308936) (as forward)
- Relation 1338378 (as forward)
- Relation 401 (2298796) (as south)
- Relation GoRaleigh 1: Triangle Town Center => GoRaleigh Station (13646237)
Nodes
6 nodes
- 5646752266 (part of ways 591458683 and Capital Boulevard (1176513117))
- 1295151672
- 3092995191 (part of way 652568919)
- 6571199872
- 1295242678 (part of way 114316243)
- 1295242689 (part of ways Buffaloe Road (693658792), New Hope Church Road (1176486412), and Capital Boulevard (1176513115))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |