Loading...
Way: Jarrold Bridge (121716381)
Version #6
Corrections to surfacing of Norwich cycle paths.
Tags
bicycle | designated |
---|---|
bridge | yes |
foot | designated |
highway | path |
layer | 1 |
name | Jarrold Bridge |
note | Official opening on Wed 30th May 2012 |
segregated | no |
surface | wood |
Part of
2 relations
- Relation Rebellion Way (16035446)
- Relation Pink Pedalway (2245973)
Nodes
9 nodes
- 1361565098 (part of ways 550271097 and 121716383)
- 5314941858
- 9553104392
- 1361565094
- 1361565092
- 1361565091
- 5314941859
- 1361565093
- 1361565097 (part of way 121716382)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |