Loading...
Way: Linha do Douro (127350654)
Version #4
Adding railway line speed limits (maximum allowable speed between two stations) and train protection systems in Portugal
Tags
electrified | no |
---|---|
gauge | 1668 |
maxspeed | 110 |
maxspeed:source | Estimated at 110 km/h. It is in the category > 90 Km/h <= 120 Km/h according to https://www.infraestruturasdeportugal.pt/sites/default/files/files/files/diretorio_da_rede_2020_0.pdf |
name | Linha do Douro |
railway | rail |
railway:atc | no |
railway:etcs | no |
railway:lzb | no |
railway:pzb | no |
source | bing |
usage | main |
Nodes
26 nodes
- Gouvinhas (1145662479) (part of way Linha do Douro (93770965))
- 1409795677
- 25927871
- 1027909150
- 370382250
- 1027909113
- 370382251
- 1027909229
- 1409795486
- 1409795649
- 25927879
- 1409795746
- 1409902313
- 1027909702
- 25927890
- 1409902527
- 1027909098
- 1409902545
- 25927893
- 1409902573
- 25927895
- 1409902571
- 1409902567 (part of way 127350685)
- 1409902566
- 1027909471
- Ferrão (1145662482)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |