Loading...
Way: 135529611
Version #10
geplante Elektrifizierung Bahnstrecken Mühldorf–Pilsting und Neumarkt-St. Veit–Landshut
Tags
electrified | no |
---|---|
gauge | 1435 |
maxspeed | 100 |
operator | DB RegioNetz Infrastruktur GmbH; Südostbayernbahn |
proposed:electrified | contact_line |
proposed:frequency | 16.7 |
proposed:voltage | 15000 |
railway | rail |
railway:pzb | yes |
service | siding |
source | Bing;DOP_LVA_BY |
source:maxspeed | Lf7 "10" bei 16.5 |
Part of
2 relations
Nodes
4 nodes
- 1488482526 (part of ways 5720 (593528975) and 5720 (220747791))
- 3478800946
- 3478574974
- 2298385413 (part of way 220747790)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |