Loading...
Way: 135531341
Version #6
geplante Elektrifizierung Bahnstrecken Mühldorf–Pilsting und Neumarkt-St. Veit–Landshut
Tags
electrified | no |
---|---|
gauge | 1435 |
operator | DB RegioNetz Infrastruktur GmbH; Südostbayernbahn |
proposed:electrified | contact_line |
proposed:frequency | 16.7 |
proposed:voltage | 15000 |
railway | rail |
railway:pzb | yes |
service | siding |
source | Bing;DOP_LVA_BY |
Nodes
12 nodes
- 1488505926 (part of ways 5720 (350967305) and 5720 (593528978))
- 5662090545
- 4347588957
- 1488505925
- 4347588956
- 4347588954
- Egglkofen (4211574950)
- 4347588950
- 1488505914
- 5662090546
- 5662090547
- 40213562 (part of ways 5720 (350967301) and 5720 (593528977))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |