Loading...
Way: 163139031
Version #18
bicycles are allowed on these connecting roads
Tags
bicycle | yes |
---|---|
destination | Seletar Link |
highway | motorway_link |
lanes | 3 |
maxspeed | 50 |
oneway | yes |
surface | asphalt |
Part of
7 relations
- Relation Svc 117 (Sembawang Interchange → Punggol Temporary Interchange) (6622944)
- Relation Svc 117M (Sembawang Interchange → Punggol Temporary Interchange) (14115245)
- Relation Svc 39 (Yishun Interchange → Tampines Concourse Interchange) (6623035)
- Relation Svc 858 (Roundtrip from Woodlands Interchange) (2353787)
- Relation Svc 858B (Before Seletar Camp G → After Seletar Camp G) (12980696)
- Relation Svc 86 (Ang Mo Kio Interchange → Sengkang Interchange) (6623091)
- Relation Svc 168 (Woodlands Interchange → Bedok Interchange) (6622980)
Nodes
5 nodes
- 1749018622 (part of ways 711607740 and 658993057)
- 6169983449
- 6169983450
- 6169983451
- 6169983452 (part of ways 711607739 and 1225837291)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |