Loading...
Way History: Neckar-Alb-Bahn (190015008)
Version #14
mapped tunnel details
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
name | Neckar-Alb-Bahn |
operator | DB Netz AG |
passenger_lines | 2 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
start_date | 1861 |
usage | main |
voltage | 15000 |
Nodes
3 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
Version #13
Bahndetails im Knoten Tübingen
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 80 |
name | Neckar-Alb-Bahn |
operator | DB Netz AG |
passenger_lines | 2 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
start_date | 1861 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
3 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
Version #12
Update river and bridges
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
name | Neckar-Alb-Bahn |
operator | DB Netz AG |
passenger_lines | 2 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
start_date | 1861 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
3 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
Version #11
railway details
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
name | Neckar-Alb-Bahn |
operator | DB Netz AG |
passenger_lines | 2 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
start_date | 1861 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
6 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
-
1757678507 -
1757678512 - 43 (1307892835) (part of ways 4630 (562498980), Neckar-Alb-Bahn (562498981), and Neckar-Alb-Bahn (1245275760))
Version #10
Strecke 4600: Korrektur
- Edited by Ruhrpottkast
- Changeset #51275583
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
name | Neckar-Alb-Bahn |
operator | DB Netz AG |
passenger_lines | 2 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
start_date | 1861 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
6 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
-
1757678507 -
1757678512 - 43 (1307892835) (part of ways 4630 (562498980), Neckar-Alb-Bahn (562498981), and Neckar-Alb-Bahn (1245275760))
Version #9
passenger-lines
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
passenger_lines | 2 |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
start_date | 1861 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
6 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
-
1757678507 -
1757678512 - 43 (1307892835) (part of ways 4630 (562498980), Neckar-Alb-Bahn (562498981), and Neckar-Alb-Bahn (1245275760))
Version #8
Gleisklassifizierung
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
start_date | 1861 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
6 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
-
1757678507 -
1757678512 - 43 (1307892835) (part of ways 4630 (562498980), Neckar-Alb-Bahn (562498981), and Neckar-Alb-Bahn (1245275760))
Version #7
Bahnanlagen-Details zwischen Reutlingen und Tübingen
Tags
electrified | yes |
---|---|
frequency | 16.7 |
gauge | 1435 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | observation |
start_date | 1861 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
6 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
-
1757678507 -
1757678512 - 43 (1307892835) (part of ways 4630 (562498980), Neckar-Alb-Bahn (562498981), and Neckar-Alb-Bahn (1245275760))
Version #6
Eisenbahn-Relationen: IC32 Münster - Ulm - Lindau - Innsbruck und Stuttgart - Tübingen hinzugefügt.
Tags
electrified | yes |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 120 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | observation |
start_date | 1861 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
6 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
-
1757678507 -
1757678512 - 43 (1307892835) (part of ways 4630 (562498980), Neckar-Alb-Bahn (562498981), and Neckar-Alb-Bahn (1245275760))
Version #5
fix wikipedia links
Tags
electrified | yes |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 120 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | observation |
start_date | 1861 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia | de:Bahnstrecke Plochingen–Tübingen |
Nodes
9 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
-
1757678507 -
1757678512 - 43 (1307892835) (part of ways 4630 (562498980), Neckar-Alb-Bahn (562498981), and Neckar-Alb-Bahn (1245275760))
-
1757678522 - W 39 (1307892748) (part of ways 115870094, Neckar-Alb-Bahn (1245275760), and Neckar-Alb-Bahn (437110334))
- W 38 (1307892784) (part of ways 115870074, Neckar-Alb-Bahn (437112432), and Neckar-Alb-Bahn (437110334))
Version #4
Geschwindigkeiten Obere Neckartalbahn
Tags
electrified | yes |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 120 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | observation |
start_date | 1861 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia:de | Bahnstrecke Plochingen–Tübingen |
Nodes
9 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
-
1757678507 -
1757678512 - 43 (1307892835) (part of ways 4630 (562498980), Neckar-Alb-Bahn (562498981), and Neckar-Alb-Bahn (1245275760))
-
1757678522 - W 39 (1307892748) (part of ways 115870094, Neckar-Alb-Bahn (1245275760), and Neckar-Alb-Bahn (437110334))
- W 38 (1307892784) (part of ways 115870074, Neckar-Alb-Bahn (437112432), and Neckar-Alb-Bahn (437110334))
Version #3
normalized operator DB Netz
Tags
electrified | yes |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 130 |
name | Neckar-Alb-Bahn |
operator | DB Netz |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | observation |
start_date | 1861 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia:de | Bahnstrecke Plochingen–Tübingen |
Nodes
9 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
-
1757678507 -
1757678512 - 43 (1307892835) (part of ways 4630 (562498980), Neckar-Alb-Bahn (562498981), and Neckar-Alb-Bahn (1245275760))
-
1757678522 - W 39 (1307892748) (part of ways 115870094, Neckar-Alb-Bahn (1245275760), and Neckar-Alb-Bahn (437110334))
- W 38 (1307892784) (part of ways 115870074, Neckar-Alb-Bahn (437112432), and Neckar-Alb-Bahn (437110334))
Version #2
Obere Neckarbahn, Ammertalbahn: Streckenkategorie, DS100
Tags
electrified | yes |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 130 |
name | Neckar-Alb-Bahn |
operator | DB Netz AG |
rack | no |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:tilting | yes |
railway:traffic_mode | mixed |
ref | 4600 |
source | observation |
start_date | 1861 |
tracks | 1 |
usage | main |
voltage | 15000 |
wikipedia:de | Bahnstrecke Plochingen–Tübingen |
Nodes
9 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
-
1757678507 -
1757678512 - 43 (1307892835) (part of ways 4630 (562498980), Neckar-Alb-Bahn (562498981), and Neckar-Alb-Bahn (1245275760))
-
1757678522 - W 39 (1307892748) (part of ways 115870094, Neckar-Alb-Bahn (1245275760), and Neckar-Alb-Bahn (437110334))
- W 38 (1307892784) (part of ways 115870074, Neckar-Alb-Bahn (437112432), and Neckar-Alb-Bahn (437110334))
Version #1
railway fixing
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
railway | rail |
source | observation |
tracks | 1 |
voltage | 15000 |
Nodes
9 nodes
- 44 (899219085) (part of ways 76217733 and 4600 (1245288504))
- 1757678497
- 1757678503 (part of way Neckar-Alb-Bahn (562498982))
-
1757678507 -
1757678512 - 43 (1307892835) (part of ways 4630 (562498980), Neckar-Alb-Bahn (562498981), and Neckar-Alb-Bahn (1245275760))
-
1757678522 - W 39 (1307892748) (part of ways 115870094, Neckar-Alb-Bahn (1245275760), and Neckar-Alb-Bahn (437110334))
- W 38 (1307892784) (part of ways 115870074, Neckar-Alb-Bahn (437112432), and Neckar-Alb-Bahn (437110334))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |