Loading...
Way: Tunnel de Chantoir (23096837)
Version #17
Infrabel ETCS rollout update
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
layer | -1 |
maxspeed | 100 |
name | Tunnel de Chantoir |
operator | Infrabel |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
railway:tbl | 1+ |
tunnel | yes |
tunnel:name | Tunnel de Chantoir |
usage | main |
voltage | 3000 |
Nodes
2 nodes
- 26445908 (part of ways L37 (23096840), 1211529602, and 1211529603)
- 249329196 (part of ways L37 (23096838), 1211529601, and 1211529605)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |