Loading...
Way: 23381910
Version #16
Elektrifizierung Zollern-Alb-Bahn 1 (Abschnitt Tübingen-Bisingen)
Tags
bridge | yes |
---|---|
electrified | no |
gauge | 1435 |
layer | 1 |
operator | DB Netz |
passenger_lines | 2 |
proposed:electrified | contact_line |
proposed:frequency | 16.7 |
proposed:voltage | 15000 |
railway | rail |
railway:etcs | no |
railway:gnt | yes |
railway:pzb | yes |
railway:radio | gsm-r |
railway:traffic_mode | mixed |
service | siding |
tracks | 1 |
Part of
4 relations
- Relation RB66: Hechingen => Tübingen (17142889)
- Relation RB66: Albstadt => Tübingen (17142890)
- Relation RB66: Sigmaringen => Tübingen (17142891)
- Relation IRE6a: Aulendorf => Stuttgart (17142883)
Nodes
7 nodes
- 253166604 (part of way 26750879)
- 1805567447
- 1805567445
- 4294120892
- 253166601
- 1805567442
- 253075621 (part of way 503183011)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |