Loading...
Way: 5700 (27693575)
Version #13
geplante Elektrifizierung Bahnstrecken Mühldorf–Pilsting und Neumarkt-St. Veit–Landshut
Tags
bridge | yes |
---|---|
electrified | no |
gauge | 1435 |
layer | 1 |
maxspeed | 120 |
operator | DB RegioNetz Infrastruktur GmbH; Südostbayernbahn |
passenger_lines | 1 |
proposed:electrified | contact_line |
proposed:frequency | 16.7 |
proposed:voltage | 15000 |
railway | rail |
railway:pzb | yes |
ref | 5700 |
source:maxspeed | Lf7 "12" bei 62.8 |
usage | main |
Nodes
2 nodes
- 304129893 (part of way Mühldorf – Pilsting (27691349))
- 304129894 (part of way 5700 (8044857))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |