Loading...
Way History: 4111 (312835446)
Version #7
Adding railway maxspeed tags between Darmstadt and Eberbach
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | -1 |
maxspeed | 100 |
meter_load | 8.0 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:lzb | no |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4111 |
ref:La | 41 |
source | bing |
source:maxspeed | Lf7 "8" bei 13.0 |
start_date | 1879 |
tunnel | yes |
tunnel:name | Feuerberg-Tunnel |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
16 nodes
Version #6
Zugsicherung
- Edited by KartoGrapHiti
- Changeset #57794154
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | -1 |
maxspeed:forward | 100 |
meter_load | 8.0 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:etcs | no |
railway:lzb | no |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4111 |
ref:La | 41 |
source | bing |
source:maxspeed | Lf7 "8" bei 13.0 |
start_date | 1879 |
tunnel | yes |
tunnel:name | Feuerberg-Tunnel |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
16 nodes
Version #5
passenger-lines
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | -1 |
maxspeed:forward | 100 |
meter_load | 8.0 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4111 |
ref:La | 41 |
source | bing |
source:maxspeed | Lf7 "8" bei 13.0 |
start_date | 1879 |
tunnel | yes |
tunnel:name | Feuerberg-Tunnel |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
16 nodes
Version #4
Signale und Hektometertafeln zwischen Eberbach und Hirschhorn (Neckar)
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | -1 |
maxspeed:forward | 100 |
meter_load | 8.0 |
operator | DB Netz AG |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4111 |
ref:La | 41 |
source | bing |
source:maxspeed | Lf7 "8" bei 13.0 |
start_date | 1879 |
tunnel | yes |
tunnel:name | Feuerberg-Tunnel |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
16 nodes
Version #3
revert of undiscussed mechanical edit in changeset 26971038 by Nzara. I changed operator=DB Netz to operator=DB Netz AG at those ways which had been splitted after his edit. See also http://forum.openstreetmap.org/viewtopic.php?id=28216
- Edited by Nakaner-repair
- Changeset #27019827
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | -1 |
maxspeed:forward | 100 |
meter_load | 8.0 |
operator | DB Netz AG |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4111 |
ref:La | 41 |
source | bing |
source:maxspeed | Lf7 "8" bei 13.0 |
start_date | 1879 |
tunnel | yes |
tunnel:name | Feuerberg-Tunnel |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
16 nodes
Version #2
normalize railway operator
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | -1 |
maxspeed:forward | 100 |
meter_load | 8.0 |
operator | DB Netz |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4111 |
ref:La | 41 |
source | bing |
source:maxspeed | Lf7 "8" bei 13.0 |
start_date | 1879 |
tunnel | yes |
tunnel:name | Feuerberg-Tunnel |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
16 nodes
Version #1
Details an den Bf Hirschhorn und Zwingenberg am Neckar, erneuter Versuch nach Übertragungsfehler
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | -1 |
maxspeed:forward | 100 |
meter_load | 8.0 |
operator | DB Netz AG |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
railway:traffic_mode | mixed |
ref | 4111 |
ref:La | 41 |
source | bing |
source:maxspeed | Lf7 "8" bei 13.0 |
start_date | 1879 |
tunnel | yes |
tunnel:name | Feuerberg-Tunnel |
usage | main |
voltage | 15000 |
workrules | EBO |
Nodes
16 nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |