Loading...
Way: 2280 (32347634)
Version #10
Adding railway maxspeed tags between Bottrop and Essen
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 16.7 |
layer | 1 |
level | 1 |
maxspeed | 80 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:pzb | yes |
ref | 2280 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Part of
7 relations
- Relation S9: Wuppertal => Haltern (325744)
- Relation RE 14: Essen => Borken (1998598)
- Relation 2280 Abzw Oberhausen Walzwerk - Essen West (3010335)
- Relation RE 14: Essen => Dorsten (10423454)
- Relation RE 14: Essen => Coesfeld (10424600)
- Relation S9: Hagen => Recklinghausen (11061629)
- Relation RE 14: Essen => Borken (14640715)
Nodes
2 nodes
- 364128580 (part of way 2280 (32347635))
- 364128581 (part of way 2280 (32347633))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |