Loading...
Way: 327273685
Version #2
usage=* und service=* in Heidelberg Hbf (in meinen Augen logischer) verteilt. Gleise mit den meisten Personenzugfahren bekommen usage=*, der Rest service=*. Richtige "durchgehende Hauptgleise" für schnelle Durchfahrten gibt es in Heidelberg Hbf ja nicht.
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 60 |
operator | DB Netz AG |
railway | rail |
railway:pzb | yes |
railway:track_ref | 1 |
railway:traffic_mode | mixed |
service | siding |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- ZV1 (3195124924) (part of way 552169532)
- 3195124925 (part of way 313516382)
- 1676232528
- 2325072134
- 2325072141
- 2325072146
- 249 (1676232531) (part of ways 4100 (276311417) and 4100 (193969266))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |