Loading...
Way: 339388904
Version #5
created relation EuroVelo 7
Tags
end_date | 1994 |
---|---|
foot | yes |
highway | cycleway |
note | this used to be the route of the major Brenner railway line until the Schlerntunnel was opened in 1994 |
railway | abandoned |
surface | asphalt |
Part of
3 relations
- Relation Cycle 1: Franzensfeste => Bolzano (411917)
- Relation EuroVelo 7 - Sun Route - part Italy 1 (2759974)
- Relation Ciclovia del Sole (2460773)
Nodes
3 nodes
- 310784858 (part of way 339388903)
- 4353704344 (part of way 437559786)
- 6416200280 (part of way 684778570)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |