Loading...
Way: I-275 Metro Trail (373782494)
Version #1
Adjusted I-275 Bike Trail from Haggerty south to Hines Drive Connector. Added missing bridges.
- Edited by DougPeterson
- Changeset #34430144
Tags
bicycle | designated |
---|---|
bridge | yes |
foot | designated |
highway | cycleway |
horse | no |
layer | 1 |
motor_vehicle | no |
name | I-275 Metro Trail |
segregated | no |
source | http://www.michigantrails.org/projects/i-275-bikeway/ |
Nodes
2 nodes
- 3771946511 (part of way I-275 Metro Trail (1134174723))
- 3771946512 (part of way I-275 Metro Trail (373782506))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |