Way History: Green Dragon Bridge (4008103)
Version #22
Green Dragon Bridge experimental addition of bicycle:advisory=dismount as per current discussion on talk-gb.
- Edited by CycleStreets
- Changeset #126749158
Tags
bicycle | yes |
---|---|
bicycle:advisory | dismount |
bridge | yes |
bridge:ref | 466598 |
designation | public_footpath |
foot | designated |
highway | cycleway |
layer | 2 |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
oneway | no |
prow_ref | Cambridge FP 21 |
segregated | no |
sidewalk | none |
source:designation | cambridgeshire_county_council_prow_gis_data |
source:prow_ref | cambridgeshire_county_council_prow_gis_data |
surface | asphalt |
width | 2.3 |
Nodes
Version #21
Upgrade lcn=yes to relation: Eastern main roads
- Edited by CycleStreets
- Changeset #121824048
Tags
bicycle | yes |
---|---|
bridge | yes |
bridge:ref | 466598 |
designation | public_footpath |
foot | designated |
highway | cycleway |
layer | 2 |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
oneway | no |
prow_ref | Cambridge FP 21 |
segregated | no |
sidewalk | none |
source:designation | cambridgeshire_county_council_prow_gis_data |
source:prow_ref | cambridgeshire_county_council_prow_gis_data |
surface | asphalt |
width | 2.3 |
Nodes
Version #20
Adding two gas pipes that cross river but are under the bridge
- Edited by kesterlester
- Changeset #115998445
Tags
bicycle | yes |
---|---|
bridge | yes |
bridge:ref | 466598 |
designation | public_footpath |
foot | designated |
highway | cycleway |
layer | 2 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
oneway | no |
prow_ref | Cambridge FP 21 |
segregated | no |
sidewalk | none |
source:designation | cambridgeshire_county_council_prow_gis_data |
source:prow_ref | cambridgeshire_county_council_prow_gis_data |
surface | asphalt |
width | 2.3 |
Nodes
Version #19
Stourbridge Common path and barrier widths
- Edited by CycleStreets
- Changeset #113920998
Tags
bicycle | yes |
---|---|
bridge | yes |
bridge:ref | 466598 |
designation | public_footpath |
foot | designated |
highway | cycleway |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
oneway | no |
prow_ref | Cambridge FP 21 |
segregated | no |
sidewalk | none |
source:designation | cambridgeshire_county_council_prow_gis_data |
source:prow_ref | cambridgeshire_county_council_prow_gis_data |
surface | asphalt |
width | 2.3 |
Nodes
Version #18
remove useless history tags left by an ancient editing software
- Edited by Mateusz Konieczny - bot account
- Changeset #105974233
Tags
bicycle | yes |
---|---|
bridge | yes |
bridge:ref | 466598 |
designation | public_footpath |
est_width | 2.5 |
foot | designated |
highway | cycleway |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
oneway | no |
prow_ref | Cambridge FP 21 |
segregated | no |
sidewalk | none |
source:designation | cambridgeshire_county_council_prow_gis_data |
source:prow_ref | cambridgeshire_county_council_prow_gis_data |
surface | asphalt |
Nodes
Version #17
Rights of Way from cambridgeshire_county_council_prow_gis_data
- Edited by Robert Whittaker
- Changeset #58801544
Tags
bicycle | yes |
---|---|
bridge | yes |
bridge:ref | 466598 |
designation | public_footpath |
est_width | 2.5 |
foot | designated |
highway | cycleway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
oneway | no |
prow_ref | Cambridge FP 21 |
segregated | no |
sidewalk | none |
source:designation | cambridgeshire_county_council_prow_gis_data |
source:prow_ref | cambridgeshire_county_council_prow_gis_data |
surface | asphalt |
Nodes
Version #16
Green Dragon Bridge has had all cyclists dismount signs removed for over a year now. Cycling is allowed on the bridge.
- Edited by CamcycleMatt
- Changeset #57676432
Tags
bicycle | yes |
---|---|
bridge | yes |
bridge:ref | 466598 |
est_width | 2.5 |
foot | yes |
highway | cycleway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
oneway | no |
segregated | no |
sidewalk | none |
surface | asphalt |
Nodes
Version #15
Green Dragon Bridge has had all cyclists dismount signs removed for over a year now. Cycling is allowed.
- Edited by CamcycleMatt
- Changeset #57676411
Tags
bicycle | yes |
---|---|
bridge | yes |
bridge:ref | 466598 |
est_width | 2.5 |
foot | yes |
highway | footway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
oneway | no |
segregated | no |
sidewalk | none |
surface | asphalt |
Nodes
Version #14
Things around the river
- Edited by Ben Harris
- Changeset #48860721
Tags
bicycle | dismount |
---|---|
bridge | yes |
bridge:ref | 466598 |
est_width | 2.5 |
foot | yes |
highway | footway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
oneway | no |
segregated | no |
sidewalk | none |
surface | asphalt |
Nodes
Version #13
Green Dragon bridge can be cycled over (dismount)
- Edited by RobinHeydon
- Changeset #40608796
Tags
bicycle | dismount |
---|---|
bridge | yes |
est_width | 2.5 |
foot | yes |
highway | footway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
oneway | no |
segregated | no |
sidewalk | none |
surface | asphalt |
Nodes
Version #12
Sustrans changes to routes in Cambridge area
Tags
bridge | yes |
---|---|
est_width | 2.5 |
foot | yes |
highway | footway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
oneway | no |
segregated | no |
sidewalk | none |
surface | asphalt |
Nodes
Version #11
Re-open the bridge, some ppl had maked it as closed because of the maintenance works.
- Edited by François Guerraz
- Changeset #21542344
Tags
bicycle | yes |
---|---|
bridge | yes |
est_width | 2.5 |
foot | yes |
highway | cycleway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
ncn | yes |
ncn_ref | 11 |
oneway | no |
segregated | no |
sidewalk | none |
surface | asphalt |
Nodes
Version #10
Green Dragon Bridge now closed for a while.
- Edited by CycleStreets
- Changeset #19887252
Tags
access:conditional | no @ week 02-11 2014 |
---|---|
bicycle | no |
bridge | yes |
est_width | 2.5 |
foot | no |
highway | cycleway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
ncn | yes |
ncn_ref | 11 |
oneway | no |
segregated | no |
sidewalk | none |
surface | asphalt |
Nodes
Version #9
specify the year for the road closure
- Edited by François Guerraz
- Changeset #19736018
Tags
access:conditional | no @ week 02-11 2014 |
---|---|
bicycle | dismount |
bridge | yes |
est_width | 2.5 |
foot | yes |
highway | cycleway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
ncn | yes |
ncn_ref | 11 |
oneway | no |
segregated | no |
sidewalk | none |
surface | asphalt |
Nodes
Version #8
Bridge will be closed for 10 weeks starting from 6th of Jan 2013
- Edited by François Guerraz
- Changeset #19735935
Tags
access:conditional | no @ week 02-11 |
---|---|
bicycle | dismount |
bridge | yes |
est_width | 2.5 |
foot | yes |
highway | cycleway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
motor_vehicle | no |
name | Green Dragon Bridge |
ncn | yes |
ncn_ref | 11 |
oneway | no |
segregated | no |
sidewalk | none |
surface | asphalt |
Nodes
Version #7
tags
- Edited by Calum Mackay
- Changeset #16057488
Tags
bicycle | dismount |
---|---|
bridge | yes |
est_width | 2.5 |
foot | yes |
highway | cycleway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
name | Green Dragon Bridge |
ncn | yes |
ncn_ref | 11 |
oneway | no |
segregated | no |
sidewalk | none |
surface | asphalt |
Nodes
Version #6
Note "cyclists dismounts" advisory notice.
- Edited by Calum Mackay
- Changeset #16021428
Tags
bicycle | dismount |
---|---|
bridge | yes |
est_width | 2.5 |
foot | yes |
highway | cycleway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
name | Green Dragon Bridge |
ncn | yes |
ncn_ref | 11 |
segregated | no |
sidewalk | none |
surface | asphalt |
Nodes
Version #5
dft cycle data merging
Tags
bridge | yes |
---|---|
est_width | 2.5 |
highway | cycleway |
history | Retrieved from v2 |
layer | 1 |
lcn | yes |
lit | no |
name | Green Dragon Bridge |
ncn | yes |
ncn_ref | 11 |
surface | asphalt |
Nodes
Version #3
Added carpark and service road for Cottenham Coop
- Edited by RobinHeydon
- Changeset #3209194
Tags
Nodes
Version #2
I know for sure that Green Dragon Br. and the path over Coldham's Common form part of the Cambridge lcn.
- Edited by Kevin Steinhardt
- Changeset #2882312
Tags
Nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |