Loading...
Way: CFR line 300 - Variant 5 - Apața-Racoș (804413717)
Version #28
update progress
- Edited by RobertH-PUM
- Changeset #152371678
Tags
bridge | yes |
---|---|
construction:railway:etcs | 2 |
layer | 1 |
maxspeed | 160 |
name | CFR line 300 - Variant 5 - Apața-Racoș |
opening_date | 2027 |
railway | construction |
status | AC,PTE,AM,builder:AKTOR / ALSTOM,progress:23%/01.05.2024 22.11%/01.04.2024 19.85%/21.12.2023 19.80%/28.11.2023 6%/31.12.2022 |
Part of
2 relations
- Relation Varianta Apata-Racos (9415548)
- Relation Reabilitare lot 2 Cata - Apata (9415550)
Nodes
6 nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |