Loading...
Changeset: 15435125
Baden-Württemberg: Gäubahn 2. Gleis Abschnitt Rottweil-Talhausen Bbf
Closed by dromedar
Tags
created_by | JOSM/1.5 (5759 de) |
---|
Discussion
Ways (1-20 of 31)
- 1
- 2
- Au-Tunnel (114 m) (211161222), v1
- Bernburg-Tunnel (269 m) (211161223), v1
- 211161224, v1
- 211161225, v1
- 211161226, v1
- 211161227, v1
- 211161228, v1
- 211161229, v1
- 211161230, v1
- 211161231, v1
- 211161232, v1
- 211161233, v1
- 211161234, v1
- 211161235, v1
- 211161236, v1
- Hohenstein-Tunnel (103 m) (211161237), v1
- Talhausen Bbf (211161238), v1
- Tierstein-Tunnel (654 m) (211161239), v1
- Au-Tunnel (114 m) (24149234), v8
- Bernburg-Tunnel (269 m) (24149232), v10
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |