Relation History: Calaca-Laguna Technopark-Biñan Power Transmission Line (1576833)
Version #5
[Laguna, Batangas, Cavite and Quezon] Add extended operator tagging, frequency and number of circuits for power lines, modify names to indicate voltage
- Edited by TagaSanPedroAko
- Changeset #115959099
Tags
Members
8 members
Version #4
[Biñan, Laguna] retag substation and add missing info, add substation components and Meralco 115 kV subtransmission lines and poles
- Edited by TagaSanPedroAko
- Changeset #44466164
Tags
Members
9 members
Version #3
[Calaca, Batangas]correct voltages, convert power=generator to power=plant for the whole plant, add substations, switchgear, water tank, gates, and power lines, adjust power plant boundary, add lane count, remove duplicate places, modify road data
- Edited by TagaSanPedroAko
- Changeset #43124528
Tags
Members
Version #2
[Biñan] extend power lines in substation, add transformers and some portals, remove voltage from de-energized transmission line
- Edited by TagaSanPedroAko
- Changeset #42918535
Tags
Members
5 members
Version #1
[Laguna/Muntinlupa] Added voltage to power lines
- Edited by ianlopez1115
- Changeset #8078912
Tags
Members
3 members
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |