-
fix the issues with airport road joining the airport terminal
-
correction to road
-
proper continuity to the new zuari bridge
-
proper traffic island at the airport junction
-
the road going towards airport/ panaji below the zuaari bidge
-
second zuari Bridge over the water is now functional. There is an exit to the airport roundabout from the elevated bridge, also there is a ramp to access the elevated bridge from the airport roundabout going towards Panaji
-
road change
-
continuity of bridge
-
road type
-
added fire brigade and restaurant
-
Springfields Residential complex added
-
included the 2 way two lane overhead bridge at the old goa junction
-
end of zuwari bridge under construction on the airport side marked
-
The new Zuari Bridge has two two sides, ONLY ONE SIDE IS COMPLETE over the river. however this is not open to traffic as on 10nov 2022. I have also made adjustments to NH66 as there are NOW two sides ( of 2 lanes each) under the elevated bridge from the
-
the railway crossing over the tracks for vehicles is no longer available and all vehicles have to use the bridge
-
overhead bridge 2 lane each side is now connected from kadamba bust station Panaji upto Agacaim
-
a small locally owned bar and restaurant next to Sheela
-
the motor way is actually an elevated overhead bridge. This is just above the current road. I drive on this road to go south goa. the bridge is joined end to end however not yet ready and open for traffic
-
overhead bridge 2 lane is now connected from sarina bar to northwards . however is not yet open to traffic
-
overhead bridge is now connected from airport junction roundabout to wards BPCL petrol pump at the southern end. however is not yet open to traffic