-
Removed foot path link between foot path and Chequers Park, merged foot path and marked Chequers Park as No Exit. Concrete ramp replaced with landscaping.
-
Corrected shape of foot path and crossing. Added stiles either side of foot crossing.
-
Begin rework of Wye
-
New "Connect 38" also changed the carpark layout and Dover Place. Added/reshaped several nearby paths and carparks.
-
Corrected number of steps - two flights of 13 steps on each side, not 11. Incorrectly signed as 56 steps.
-
Add tennis courts.
-
Add weir.
-
Adjusted shape of road.
-
Moved restaurant to correct location and added information. Opening hours missing from their website. Restaurant re-opened 2019-02-21 after a fire.
-
Straightened paths across fields (actual shape changes each year). Connected paths. Added missing stile. Added missing ditch (more still left to be added).
-
Add missing footpaths. Fettle nearby footpaths. Adjust land use areas to fit aerial imagery. Adjust surface types. Add missing gates and cattle grid.
-
Add missing substation, upgrade tag on other substation.
-
Correcting road directionality, adding surface type and lanes. Added gates to footpath added earlier.
-
Modified station building to correct shape. Footbridge was replaced a couple years ago - steps are now both on the same side. Will recount steps next time I visit. Added and moved other facilities at the station.
-
Moved Fire Station marker to correct building.
-
Add missing footpaths. Add surface types and lane numbers to nearby roads.