Loading...
Way: DJ709 (100956870)
Version #12
Updated road alignment and geometry + added new road geometry + updated highway type in Arad County, Romania. #Kaart 2021
Tags
highway | secondary |
---|---|
lanes | 2 |
maxspeed | 90 |
oneway | no |
ref | DJ709 |
smoothness | intermediate |
surface | asphalt |
surface_survey | 2019AUG_IonutPaduretu |
Part of
1 relation
- Relation DJ709 (8844286)
Nodes
24 nodes
- 1166258369 (part of way DJ709 (8514298))
- 36147301
- 6394621985
- 6378712914
- 1581453922
- 36147302
- 9053315688
- 9053315687
- 9053315686
- 6394621986
- 9053315685
- 9053315684
- 9053315683
- 9053315682
- 9053315689
- 9053315690
- 9053315691
- 9053315692 (part of way 978407637)
- 1581453929
- 9053315693
- 9053315695 (part of way 978407636)
- 9053315670
- 9053315694
- 558025870 (part of way Strada Tudor Vladimirescu (43893901))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |