Loading...
Way: 114667996
Version #6
Bf Baden: correct systematic geometric shift of rail tracks, platforms and platform roofs.
Tags
bridge | yes |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
layer | 1 |
maxspeed | 70 |
operator | SBB |
passenger_lines | 3 |
railway | rail |
railway:etcs | 1 |
tracks | 1 |
usage | main |
voltage | 15000 |
Nodes
3 nodes
- 1298342395 (part of way 114668015)
- 10939228474
- 1298342347 (part of way 114668016)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |