Loading...
Way: Chessie Trail (1238312233)
Version #1
Update chessie trail status to match incomplete status down Tyler Street
Tags
bicycle | designated |
---|---|
check_date | 2023-07-11 |
description | "Chessie Trail Phase II" goes from pine lake avenue into La Porte downtown, down Tyler Street and First Street. |
foot | designated |
highway | proposed |
name | Chessie Trail |
opening_date | 2023-06-30 |
proposed | cycleway |
segregated | no |
surface | concrete |
width | 3.05 |
Part of
1 relation
- Relation La Porte Priority Loop (16480930)
Nodes
14 nodes
- 10081793580 (part of ways 1238312234, 1238312235, Chessie Trail (1238312236), and 1101712442)
- 10768512488 (part of ways 1238312235 and Lake Street (1050601003))
- 10097969067 (part of ways 1101726210, 1238312231, and 1238312235)
- 10097969068 (part of ways 805916441 and 1238312231)
- 10101108225
- 10768512487
- 11434920801 (part of way 382324903)
- 11434920800 (part of way Chicago Line (881789460))
- 11434920799 (part of way Chicago Line (881789457))
- 10778874040 (part of ways 1079773847 and 1103843427)
- 10101108226 (part of way 1103843427)
- 9897539624 (part of ways 1079773837 and 1103843427)
- 6947231072 (part of ways 1103843427, Washington Street (17428371), and Washington Street (1215352984))
- 9888724953 (part of ways 1076876383, 1103843427, and Chessie Trail (1238312232))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |