Way History: 4950 (140046990)
Version #11
Adding railway maxspeed tags between Heilbronn and Schwäbisch Hall
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
maxspeed | 110 |
meter_load | 8.0 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
ref | 4950 |
ref:La | 62 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- 51 (1534476341) (part of ways 140046992 and 4950 (179466681))
- 3640975287
- 1166374173
- 4215706308
- 32 (3640975280)
- 4215706302
- 1166374156 (part of way 4950 (100973065))
Version #10
passenger-lines
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
meter_load | 8.0 |
operator | DB Netz AG |
passenger_lines | 2 |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
ref | 4950 |
ref:La | 62 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- 51 (1534476341) (part of ways 140046992 and 4950 (179466681))
- 3640975287
- 1166374173
- 4215706308
- 32 (3640975280)
- 4215706302
- 1166374156 (part of way 4950 (100973065))
Version #9
Details Abstellanlage Öhringen-Cappel
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
meter_load | 8.0 |
operator | DB Netz AG |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
ref | 4950 |
ref:La | 62 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
7 nodes
- 51 (1534476341) (part of ways 140046992 and 4950 (179466681))
- 3640975287
- 1166374173
- 4215706308
- 32 (3640975280)
- 4215706302
- 1166374156 (part of way 4950 (100973065))
Version #8
Cappel–Schwäbisch Hall-Hessental: zulässige Höchstgeschwindigkeit nach gemappten Signalen an der Strecke ergänzt. Korrekturen entsprechend Validator
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
meter_load | 8.0 |
operator | DB Netz AG |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
ref | 4950 |
ref:La | 62 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
5 nodes
- 51 (1534476341) (part of ways 140046992 and 4950 (179466681))
- 3640975287
- 1166374173
- 32 (3640975280)
- 1166374156 (part of way 4950 (100973065))
Version #7
Signale und Sonstiges S-Bahn Heilbronn und Neckartal
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
meter_load | 8.0 |
operator | DB Netz AG |
priority | primary |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
ref | 4950 |
ref:La | 62 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
5 nodes
- 51 (1534476341) (part of ways 140046992 and 4950 (179466681))
- 3640975287
- 1166374173
- 32 (3640975280)
- 1166374156 (part of way 4950 (100973065))
Version #6
Streckennummern und -Daten im nordöstlichen RB Südwest
Tags
axle_load | 22.5 |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
meter_load | 8.0 |
operator | DB Netz AG |
priority | primary |
railway | rail |
railway:maximum_current | 600 |
railway:pzb | yes |
railway:radio | gsm-r |
railway:track_class | D4 |
ref | 4950 |
ref:La | 62 |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
3 nodes
- 51 (1534476341) (part of ways 140046992 and 4950 (179466681))
- 1166374173
- 1166374156 (part of way 4950 (100973065))
Version #5
Priority-Tag gesetzt
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
operator | DB Netz |
priority | primary |
railway | rail |
usage | main |
voltage | 15000 |
Nodes
3 nodes
- 51 (1534476341) (part of ways 140046992 and 4950 (179466681))
- 1166374173
- 1166374156 (part of way 4950 (100973065))
Version #4
normalized operators
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
operator | DB Netz |
railway | rail |
usage | main |
voltage | 15000 |
Nodes
3 nodes
- 51 (1534476341) (part of ways 140046992 and 4950 (179466681))
- 1166374173
- 1166374156 (part of way 4950 (100973065))
Version #3
fehlende operator=* an railway=rail in der Region Heilbronn-Franken (hauptsächlich TC und TH); Relations-Fixes Hohenlohebahn
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
operator | DB Netz AG |
railway | rail |
usage | main |
voltage | 15000 |
Nodes
3 nodes
- 51 (1534476341) (part of ways 140046992 and 4950 (179466681))
- 1166374173
- 1166374156 (part of way 4950 (100973065))
Version #2
s4 öhringen-heilbronn
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
railway | rail |
tracks | 1 |
voltage | 15000 |
Nodes
3 nodes
- 51 (1534476341) (part of ways 140046992 and 4950 (179466681))
- 1166374173
- 1166374156 (part of way 4950 (100973065))
Version #1
Hohenlohebahn: Elektrifizierung (Auswahl über bereits bestehende Relation für KBS 783 und das Way-selector-Plugin für JOSM). Haltepunkte Öhringen West und Öhringen-Cappel mit Bahnsteig(en) und Zuwegen versehen. Abstellgleise für Überlandstraßenbahnen.
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
oneway | yes |
railway | rail |
tracks | 1 |
voltage | 15000 |
Nodes
3 nodes
- 51 (1534476341) (part of ways 140046992 and 4950 (179466681))
- 1166374173
- 1166374156 (part of way 4950 (100973065))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |