Loading...
Way: US 30 (144363699)
Version #2
Work along rail corridor from Wood River to Shelton, NE
Tags
highway | primary |
---|---|
lanes | 2 |
maxspeed | 35 mph |
ref | US 30 |
tiger:cfcc | A21 |
tiger:county | Buffalo, NE |
tiger:zip_left | 68876 |
Nodes
10 nodes
- 133190571 (part of way Highway 30 (144363734))
- 2450608529
- 133184787 (part of way South D Street (144363695))
- 133190577 (part of ways C Street (690897467) and C Street (14031907))
- 133190579 (part of way South B Street (14034037))
- 133168499 (part of way South A Street (14030209))
- 133062085 (part of way East 1st Street (14020630))
- 133165626 (part of ways South Coady Street (14030072), East 1st Street (14030820), and North Coady Street (14033859))
- 133190580
- 133140020 (part of ways 14028026 and Highway 30 (144363710))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |