Loading...
Way: 4802 (218755557)
Version #9
Stuttgart Hauptbahnhof: Reaktivierung Gleise 1 und 2 abgeschlossen
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
note | Gleis wurde im November 2017 für Gleisarbeiten außer Betrieb genommen und Ende 2018 wieder aufgebaut |
operator | DB Netz |
railway | rail |
railway:pzb | yes |
railway:track_ref | 1 |
ref | 4802 |
ref_estimation | 010 |
source | survey |
usage | main |
voltage | 15000 |
workrules | DE:EBO |
Nodes
2 nodes
- 113 (1477061305) (part of ways 218755572, 4802 (543335329), and 27111945)
- 1477061283 (part of way 4802 (134273669))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |