Loading...
Way: 238169949
Version #5
Added S90
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
maxspeed | 105 |
operator | SBB |
railway | rail |
railway:etcs | 1 |
tracks | 1 |
tunnel | yes |
usage | main |
voltage | 15000 |
Part of
9 relations
- Relation 542 (2880292)
- Relation Treno S90: Guibiasco => Mendrisio (14604625)
- Relation Treno S10: Biasca => Chiasso (14604786)
- Relation Treno S10: Biasca => Como San Giovanni (14604787)
- Relation Treno S50: Biasca => Malpensa Aeroporto (14605485)
- Relation Treno RE80: Locarno => Chiasso (14604680)
- Relation 600 (2647974)
- Relation EC 151: Frankfurt => Milano (8392115)
- Relation Treno RE80: Locarno => Milano Centrale (14432434)
Nodes
2 nodes
- 2460241393 (part of way 238169965)
- 2460241392 (part of way 238169957)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |