Loading...
Way: 24026461
Version #17
railway electrification - 3 kV is being built now - later the line will be upgraded to 25 kV
Tags
electrified | no |
---|---|
fixme | better res needed |
gauge | 1435 |
maxspeed | 65 |
passenger_lines | 1 |
proposed:electrified | contact_line |
proposed:frequency | 0 |
proposed:voltage | 3000 |
railway | rail |
railway:etcs | no |
railway:ls | no |
railway:lzb | no |
railway:pzb | no |
source:maxspeed | sign |
usage | main |
Nodes
14 nodes
- Troubelice zastávka (260560921) (part of way 1149508872)
- 3656012188
- 3656012189
- 1837814312
- 3656012190
- 3656012191
- 1837814314
- 3656012192
- 1837814332
- 3656012193
- 3656012194
- 1837814334 (part of way 1149508871)
- 3656012195 (part of way 1149508871)
- 1839088674 (part of ways 1149508871 and 173084742)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |