Way History: 25662658
Version #11
Update cycleway following rides
Tags
bicycle | designated |
---|---|
designation | public_footpath |
fixme | incline estimated from geograph photograph |
foot | designated |
highway | steps |
horse | no |
incline | 30% |
motor_vehicle | no |
prow_ref | Burwell FP 6 |
ramp:bicycle | yes |
source:designation | cambridgeshire_county_council_prow_gis_data |
source:prow_ref | cambridgeshire_county_council_prow_gis_data |
step_count | 10 |
Nodes
Version #10
Updating access on steps at Wicken Fen
- Edited by Olivia Ragone
- Changeset #140679039
Tags
bicycle | designated |
---|---|
designation | public_footpath |
foot | designated |
highway | steps |
horse | no |
motor_vehicle | no |
prow_ref | Burwell FP 6 |
ramp:bicycle | yes |
source:designation | cambridgeshire_county_council_prow_gis_data |
source:prow_ref | cambridgeshire_county_council_prow_gis_data |
Nodes
Version #9
Sustrans map has 'Old C2C' route as NCN 7. Created separate relation with ref=C2C + route=mtb as full route still exists as a 'challenge' route - https://www.sustrans.org.uk/Sea-to-Sea-C2C-cycle-route
Tags
bicycle | designated |
---|---|
designation | public_footpath |
foot | designated |
highway | steps |
prow_ref | Burwell FP 6 |
ramp:bicycle | yes |
source:designation | cambridgeshire_county_council_prow_gis_data |
source:prow_ref | cambridgeshire_county_council_prow_gis_data |
Nodes
Version #8
Rights of Way from cambridgeshire_county_council_prow_gis_data
- Edited by Robert Whittaker
- Changeset #48682167
Tags
bicycle | designated |
---|---|
designation | public_footpath |
foot | designated |
highway | steps |
ncn_ref | 11 |
prow_ref | Burwell FP 6 |
ramp:bicycle | yes |
source:designation | cambridgeshire_county_council_prow_gis_data |
source:prow_ref | cambridgeshire_county_council_prow_gis_data |
Nodes
Version #7
ncn11 rerouted via Reach Lode Bridge, opened 2010-09-12, all now signposted on the ground
Tags
highway | steps |
---|---|
ncn_ref | 11 |
ramp:bicycle | yes |
Nodes
Version #6
Ooooo wait: bicycle ramps, Cockup Bridge.
- Edited by Kevin Steinhardt
- Changeset #5773432
Tags
highway | steps |
---|---|
ramp:bicycle | yes |
Nodes
Version #4
Proposed NCN routes across the Fens of Cambridgeshire.
- Edited by Kevin Steinhardt
- Changeset #5583561
Tags
Nodes
Version #3
BBOX:0.29,52.30,0.29,52.30 ADD:0 UPD:1 DEL:0
- Edited by Flitzpiepe
- Changeset #4742804
Tags
Nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |