Loading...
Way: 29558433
Version #12
Change paths to shared cycle/pedstrian routes as pre signs in the area. Add designated cycle route to sections of road that are part of the cycle network in Carmarthen. Tweak layouts of some areas.
- Edited by tech_pixie
- Changeset #111604022
Tags
Part of
2 relations
Nodes
22 nodes
- 316022652 (part of ways Brickyard Lane (296750060), 28741755, and Pothouse Road (29558403))
- 7611268406 (part of way 814846164)
- 3007178979 (part of way 87453875)
- 3007178980 (part of way 296911015)
- 9117590937
- 9117590935
- 9117590936
- 3007178982
- 3007154036
- 3007154037
- 9117590942
- 9117590941
- 3007154038 (part of way 87453872)
- 3007154039
- 9117590940
- 9117590946
- 9117590947
- 3056446263
- 9117590948
- 9117590959
- 9117590960
- 383665140 (part of ways 33577888 and 88609076)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |