Loading...
Way: Southeast 2nd Avenue (315469416)
Version #8
Update and improve sidewalks and crossing in Downtown Hillsboro and add building under construction for Merrill Gardens.
- Edited by jhmeniscus
- Changeset #137939695
Tags
bicycle | designated |
---|---|
highway | unclassified |
lanes | 2 |
maxspeed | 20 mph |
name | Southeast 2nd Avenue |
oneway | yes |
parking:condition:both:default:maxstay | no |
parking:condition:both:maxstay | 2 hours |
parking:condition:both:time_interval | Mo-Sa 08:00-17:00 |
parking:lane:both | parallel |
parking:lane:both:parallel | on_street |
sidewalk | both |
surface | concrete |
Nodes
10 nodes
- 38747513 (part of ways Southeast Washington Street (315469433), Southeast Washington Street (24548662), and Southeast 2nd Avenue (315469411))
- 334064975 (part of way 125699571)
- 334064725 (part of way 109598691)
- 266912979 (part of way Southeast Washington Street (27422664))
- 1262694335 (part of way 1186028465)
- 4339383410 (part of way 772472514)
- 4339383428 (part of way 436052179)
- 1715105680 (part of way 159395552)
- 1715105689 (part of way East Main Street (159395545))
- 38741222 (part of ways Northeast 2nd Avenue (5393005), East Main Street (918150979), and East Main Street (315476267))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |