Loading...
Way: Northeast 145th Street (335999398)
Version #13
NE 145th St closed between 1st Ave NE and I-5 S ramps. Closure expected to last 7 months. Sidewalks are currently closed too, but the plan is to create a walking/biking detour along 3rd Ave NE and NE 147th St.
- Edited by pesticides
- Changeset #149639297
Tags
alt_name | State Route 523 |
---|---|
check_date | 2024-04-05 |
construction | primary |
cycleway:both | no |
highway | construction |
lanes | 4 |
maxspeed | 35 mph |
name | Northeast 145th Street |
oneway | no |
opening_date | 2024-10 |
ref | WA 523 |
shoulder | no |
smoothness | intermediate |
surface | asphalt |
tiger:cfcc | A31 |
tiger:county | King, WA |
tiger:name_base | 145th |
tiger:name_base_1 | State Route 523 |
tiger:name_direction_prefix | NE |
tiger:name_type | Street |
Part of
6 relations
- Relation 8323866 (as from)
- Relation 8323866 (as to)
- Relation Metro Route 304 (8643143) (as forward)
- Relation WA 523 (2858862)
- Relation Shoreline (237358) (as outer)
- Relation Seattle (237385) (as outer)
Nodes
2 nodes
- 30757867 (part of ways 1049519872, 428094933, and Northeast 145th Street (428285402))
- 7431825773 (part of ways 4th Avenue Northeast (6368037), Northeast 145th Street (889255166), and 62801264)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |