Loading...
Way: Joliet Subdivision (365981412)
Version #7
Lincoln Corridor rail detailing + Lexington QZ work.
- Edited by UrbanUnPlanner
- Changeset #140036441
Tags
bridge | yes |
---|---|
electrified | no |
gauge | 1435 |
layer | 1 |
maxspeed | 110 mph |
maxspeed:freight | 60 mph |
name | Joliet Subdivision |
note:old_railway_operator | Alton |
old_railway_operator | GM&O |
operator | Union Pacific Railroad |
operator:wikidata | Q725793 |
railway | rail |
railway:ptc | yes |
railway:track_class | 6 |
tiger:cfcc | B11:B21 |
tiger:county | Livingston, IL:McLean, IL |
tiger:name_base | Illinois Central Railroad:Southern Pacific Railroad |
usage | main |
Nodes
2 nodes
- 3699765721 (part of way Joliet Subdivision (365981406))
- 3699765720 (part of way Joliet Subdivision (365981419))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |