Loading...
Way: 384816486
Version #2
Bahn - Tram Darmstadt - Added 600V Electrification tags & modified infrastructure - south-eastern lines
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1000 |
railway | tram |
voltage | 600 |
Part of
5 relations
- Relation Linie 5: Böllenfalltor => Kranichstein (68611)
- Relation Linie 3: Lichtenbergschule => Darmstadt Hbf (5394735)
- Relation Linie 2: TU Lichtwiese => Hauptbahnhof (5390307)
- Relation Linie 7: Lichtenbergschule => Eberstadt Frankenstein (5394292)
- Relation Linie 9: Böllenfalltor => Griesheim (5394636)
Nodes
2 nodes
- 3819651939 (part of way 378537218)
- 243365117 (part of ways 378580291 and 437408864)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |