Loading...
Way: 40928227
Version #19
SSB Möhringen - Bopser start_date
Tags
description:start_date | Tunnel Möhringen Albstr - Waldau 1990 eröffnet, strecke verlief davor über die Weinsteige |
---|---|
electrified | contact_line |
frequency | 0 |
gauge | 1000;1435 |
maxspeed | 65 |
network | VVS |
operator | SSB AG |
railway | light_rail |
railway:pzb | yes |
start_date | 1990 |
voltage | 750 |
workrules | DE:BOStrab |
Part of
4 relations
Nodes
10 nodes
- 498454483 (part of ways 40928228 and 370269856)
- 1348268346
- 498454486
- 1348268597
- 498454489
- 3739803916 (part of way 24441142)
- 1106029336 (part of way 24441142)
- 3739803919 (part of way 24441142)
- 498454491
- 2379417816 (part of way 229329612)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |