Loading...
Way: 436985398
Version #2
Add separated sidewalk on south side of NE Evergreen Road for better connectivity, especially when cycle and foot paths are connected at Jackson School Road.
- Edited by jhmeniscus
- Changeset #107457804
Tags
Nodes
8 nodes
- 4348185528 (part of way Northwest Glencoe Road (73345166))
- 8895818612 (part of way 961700429)
- 4348185527 (part of way 436985395)
- 4348185526 (part of way 436985395)
- 4348185525
- 4348185523
- 4348185524
- 4348185541 (part of way 436985386)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |