Loading...
Way: Pamplona–San Pedro (502714258)
Version #2
[Muntinlupa] correct name of substation at Filinvest, add pole numbers and line names, remap substation at Ayala Alabang
- Edited by TagaSanPedroAko
- Changeset #134846165
Tags
cables | 3 |
---|---|
frequency | 60 |
name | Pamplona–San Pedro |
operator | Meralco |
power | line |
voltage | 115000 |
wires | single |
Part of
1 relation
- Relation San Pedro - Pamplona Subtransmission Line (6466065) (as line)
Nodes
2 nodes
- DR1 40T (4105528602) (part of ways 502714255, 474156200, and Pamplona–San Pedro (502714257))
- DR1 41T (4105528600) (part of ways 502714256 and Pamplona–San Pedro (358358367))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |