Way History: M18 (514899082)
Version #6
Irish M18 carriageway_ref=N/S
- Edited by JeroenvanderGun
- Changeset #146070735
Tags
bridge | yes |
---|---|
carriageway_ref | S |
highway | motorway |
lanes | 2 |
layer | 1 |
maxspeed | 120 |
note | Approximate location of current works to within 50m, to be improved when we put some Diesel in the Drone. |
oneway | yes |
ref | M18 |
surface | asphalt |
Nodes
2 nodes
- 5029502176 (part of way M18 (514898510))
- 5029502177 (part of way M18 (514899081))
Version #5
Update to remove makey-upey names added to routes
Tags
bridge | yes |
---|---|
highway | motorway |
lanes | 2 |
layer | 1 |
maxspeed | 120 |
note | Approximate location of current works to within 50m, to be improved when we put some Diesel in the Drone. |
oneway | yes |
ref | M18 |
surface | asphalt |
Nodes
2 nodes
- 5029502176 (part of way M18 (514898510))
- 5029502177 (part of way M18 (514899081))
Version #4
Added the names of the "Newmarket-on-Fergus Bypass", "Ennis Bypass", "Gort to Crusheen Motorway", and "Gort to Oranmore Motorway" to their respective stretches of the M18 motorway; and added name "Galway to Tuam Motorway" to the M17 motorway; in Ireland.
- Edited by TheFreshChief
- Changeset #71348161
Tags
bridge | yes |
---|---|
highway | motorway |
lanes | 2 |
layer | 1 |
maxspeed | 120 |
name | Gort to Oranmore Motorway |
note | Approximate location of current works to within 50m, to be improved when we put some Diesel in the Drone. |
oneway | yes |
ref | M18 |
surface | asphalt |
Nodes
2 nodes
- 5029502176 (part of way M18 (514898510))
- 5029502177 (part of way M18 (514899081))
Version #3
Adjusted maxspeed
Tags
bridge | yes |
---|---|
highway | motorway |
lanes | 2 |
layer | 1 |
maxspeed | 120 |
note | Approximate location of current works to within 50m, to be improved when we put some Diesel in the Drone. |
oneway | yes |
ref | M18 |
surface | asphalt |
Nodes
2 nodes
- 5029502176 (part of way M18 (514898510))
- 5029502177 (part of way M18 (514899081))
Version #2
Opening new sections of M17 and M18 a few days early to allow end-user consumers of the data to get updated as promptly as possible. Opening date 27 Sep.
Tags
bridge | yes |
---|---|
highway | motorway |
lanes | 2 |
layer | 1 |
note | Approximate location of current works to within 50m, to be improved when we put some Diesel in the Drone. |
oneway | yes |
ref | M18 |
surface | asphalt |
Nodes
2 nodes
- 5029502176 (part of way M18 (514898510))
- 5029502177 (part of way M18 (514899081))
Version #1
Updated geometry of motorway construction project
Tags
bridge | yes |
---|---|
construction | motorway |
highway | construction |
lanes | 2 |
layer | 1 |
note | Approximate location of current works to within 50m, to be improved when we put some Diesel in the Drone. |
oneway | yes |
ref | M18 |
surface | asphalt |
Nodes
2 nodes
- 5029502176 (part of way M18 (514898510))
- 5029502177 (part of way M18 (514899081))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |