Loading...
Way: North 107th Street (574902465)
Version #1
Correcting osm inspector-tagged errors. Combined divided highway where no divided highway exists."A divided highway (also separated highway) is any highway where traffic flows are physically separated by a barrier (e.g., grass, concrete, steel)"
- Edited by chachafish
- Changeset #57677823
Tags
CDOT_route | 287C |
---|---|
NHS | yes |
hgv | designated |
hgv:national_network | yes |
highway | primary |
lanes | 4 |
maxspeed | 60 mph |
name | North 107th Street |
ref | US 287 |
source:hgv:national_network | CDOT "Highway Data Explorer" |
surface | concrete |
tiger:cfcc | A25 |
tiger:county | Boulder, CO |
tiger:name_base | US Hwy 287 (Bypass) |
tiger:reviewed | yes |
Nodes
2 nodes
- 5517581485 (part of ways 46145967 and US 287 (574902464))
- 5517581476 (part of ways Boulder Industrial Lead (46145969) and US 287 (628655371))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |