Way History: Chemin de Fer de Bordeaux à Sète (61980027)
Version #18
nettoyage tag inutile (Aude) #detail
- Edited by Denis_Helfer
- Changeset #132341135
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
importance | national |
loading_gauge | TSI_GB |
maxspeed | 160 |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
operator | SNCF Réseau |
passenger_lines | 2 |
railway | rail |
railway:kvb | yes |
railway:track_ref | 2 |
ref | 640000 |
ref:FR:SNCF_Reseau | 640000,1,V2,0.000,406.117 |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
- 258118917
- 2145848797
- 2145848799
- 258118918
- 2145848802
- 2145848804
- 258118920
- 2145848807
- 2145848809
- 258118921
- 2145848812
- 2145848814
- 258118923
- 2145848817
- 2145848819
- 2145848821
- 258118925
- 769334253
- 2145848824
- 258118926
- 258118929
- 258118930
- 2145845523
- 2145845521
- 772778990 (part of way 640000 (61980033))
Version #17
ajout du gabarit de lignes ferroviaires en france
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 0 |
gauge | 1435 |
importance | national |
loading_gauge | TSI_GB |
maxspeed | 160 |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
operator | SNCF |
passenger_lines | 2 |
railway | rail |
railway:kvb | yes |
railway:track_ref | 2 |
ref | 640000 |
ref:FR:SNCF_Reseau | 640000,1,V2,0.000,406.117 |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
- 258118917
- 2145848797
- 2145848799
- 258118918
- 2145848802
- 2145848804
- 258118920
- 2145848807
- 2145848809
- 258118921
- 2145848812
- 2145848814
- 258118923
- 2145848817
- 2145848819
- 2145848821
- 258118925
- 769334253
- 2145848824
- 258118926
- 258118929
- 258118930
- 2145845523
- 2145845521
- 772778990 (part of way 640000 (61980033))
Version #16
Adding train protection tags to railways in France
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 0 |
gauge | 1435 |
importance | national |
maxspeed | 160 |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
operator | SNCF |
passenger_lines | 2 |
railway | rail |
railway:kvb | yes |
railway:track_ref | 2 |
ref | 640000 |
ref:FR:SNCF_Reseau | 640000,1,V2,0.000,406.117 |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
- 258118917
- 2145848797
- 2145848799
- 258118918
- 2145848802
- 2145848804
- 258118920
- 2145848807
- 2145848809
- 258118921
- 2145848812
- 2145848814
- 258118923
- 2145848817
- 2145848819
- 2145848821
- 258118925
- 769334253
- 2145848824
- 258118926
- 258118929
- 258118930
- 2145845523
- 2145845521
- 772778990 (part of way 640000 (61980033))
Version #15
corrections/ajustements cohérence tags ref:FR:SNCF_Reseau
- Edited by Denis_Helfer
- Changeset #112254081
Tags
detail | track |
---|---|
electrified | contact_line |
frequency | 0 |
gauge | 1435 |
importance | national |
maxspeed | 160 |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
operator | SNCF |
passenger_lines | 2 |
railway | rail |
railway:track_ref | 2 |
ref | 640000 |
ref:FR:SNCF_Reseau | 640000,1,V2,0.000,406.117 |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
- 258118917
- 2145848797
- 2145848799
- 258118918
- 2145848802
- 2145848804
- 258118920
- 2145848807
- 2145848809
- 258118921
- 2145848812
- 2145848814
- 258118923
- 2145848817
- 2145848819
- 2145848821
- 258118925
- 769334253
- 2145848824
- 258118926
- 258118929
- 258118930
- 2145845523
- 2145845521
- 772778990 (part of way 640000 (61980033))
Version #14
add of field ref:FR:SNCF_Reseau
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
importance | national |
maxspeed | 160 |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
operator | SNCF |
passenger_lines | 2 |
railway | rail |
railway:track_ref | 2 |
ref | 640000 |
ref:FR:SNCF_Reseau | 640000,1,V2,0.000,406.117 |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
- 258118917
- 2145848797
- 2145848799
- 258118918
- 2145848802
- 2145848804
- 258118920
- 2145848807
- 2145848809
- 258118921
- 2145848812
- 2145848814
- 258118923
- 2145848817
- 2145848819
- 2145848821
- 258118925
- 769334253
- 2145848824
- 258118926
- 258118929
- 258118930
- 2145845523
- 2145845521
- 772778990 (part of way 640000 (61980033))
Version #13
Trackinformation added, Toulouse - Sète
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
importance | national |
maxspeed | 160 |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
operator | SNCF |
passenger_lines | 2 |
railway | rail |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
- 258118917
- 2145848797
- 2145848799
- 258118918
- 2145848802
- 2145848804
- 258118920
- 2145848807
- 2145848809
- 258118921
- 2145848812
- 2145848814
- 258118923
- 2145848817
- 2145848819
- 2145848821
- 258118925
- 769334253
- 2145848824
- 258118926
- 258118929
- 258118930
- 2145845523
- 2145845521
- 772778990 (part of way 640000 (61980033))
Version #12
corr
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
importance | national |
maxspeed | 160 |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
operator | SNCF |
passenger_lines | 2 |
railway | rail |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 772778990 (part of way 640000 (61980033))
- 2145845521
- 2145845523
- 258118930
- 258118929
- 258118926
- 2145848824
- 769334253
- 258118925
- 2145848821
- 2145848819
- 2145848817
- 258118923
- 2145848814
- 2145848812
- 258118921
- 2145848809
- 2145848807
- 258118920
- 2145848804
- 2145848802
- 258118918
- 2145848799
- 2145848797
- 258118917
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
Version #11
passenger-lines
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
importance | national |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
operator | SNCF |
passenger_lines | 2 |
railway | rail |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 772778990 (part of way 640000 (61980033))
- 2145845521
- 2145845523
- 258118930
- 258118929
- 258118926
- 2145848824
- 769334253
- 258118925
- 2145848821
- 2145848819
- 2145848817
- 258118923
- 2145848814
- 2145848812
- 258118921
- 2145848809
- 2145848807
- 258118920
- 2145848804
- 2145848802
- 258118918
- 2145848799
- 2145848797
- 258118917
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
Version #10
FR: reverter and fix operato and importance on railway
- Edited by jseigneuret
- Changeset #40005489
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
importance | national |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
operator | SNCF |
railway | rail |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 772778990 (part of way 640000 (61980033))
- 2145845521
- 2145845523
- 258118930
- 258118929
- 258118926
- 2145848824
- 769334253
- 258118925
- 2145848821
- 2145848819
- 2145848817
- 258118923
- 2145848814
- 2145848812
- 258118921
- 2145848809
- 2145848807
- 258118920
- 2145848804
- 2145848802
- 258118918
- 2145848799
- 2145848797
- 258118917
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
Version #9
Changing importance, electrified and train tags for Bordeaux-Toulouse-Montpellier-Marseille rail line
- Edited by MonsieurOSM
- Changeset #39907047
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
importance | national |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
operator | SNCF |
railway | rail |
source | landsat / gps |
train | yes |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 772778990 (part of way 640000 (61980033))
- 2145845521
- 2145845523
- 258118930
- 258118929
- 258118926
- 2145848824
- 769334253
- 258118925
- 2145848821
- 2145848819
- 2145848817
- 258118923
- 2145848814
- 2145848812
- 258118921
- 2145848809
- 2145848807
- 258118920
- 2145848804
- 2145848802
- 258118918
- 2145848799
- 2145848797
- 258118917
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
Version #8
Changing operator tag Combs-la-Ville -> Saint-Louis
- Edited by MonsieurOSM
- Changeset #39841164
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
importance | national |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
operator | SNCF |
railway | rail |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 772778990 (part of way 640000 (61980033))
- 2145845521
- 2145845523
- 258118930
- 258118929
- 258118926
- 2145848824
- 769334253
- 258118925
- 2145848821
- 2145848819
- 2145848817
- 258118923
- 2145848814
- 2145848812
- 258118921
- 2145848809
- 2145848807
- 258118920
- 2145848804
- 2145848802
- 258118918
- 2145848799
- 2145848797
- 258118917
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
Version #7
Set importance=national for the lines between toulous, montpellier and cerbère
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
importance | national |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
railway | rail |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 772778990 (part of way 640000 (61980033))
- 2145845521
- 2145845523
- 258118930
- 258118929
- 258118926
- 2145848824
- 769334253
- 258118925
- 2145848821
- 2145848819
- 2145848817
- 258118923
- 2145848814
- 2145848812
- 258118921
- 2145848809
- 2145848807
- 258118920
- 2145848804
- 2145848802
- 258118918
- 2145848799
- 2145848797
- 258118917
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
Version #6
Set importance=regional for TER Languedoc Roussillon
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
importance | regional |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
railway | rail |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 772778990 (part of way 640000 (61980033))
- 2145845521
- 2145845523
- 258118930
- 258118929
- 258118926
- 2145848824
- 769334253
- 258118925
- 2145848821
- 2145848819
- 2145848817
- 258118923
- 2145848814
- 2145848812
- 258118921
- 2145848809
- 2145848807
- 258118920
- 2145848804
- 2145848802
- 258118918
- 2145848799
- 2145848797
- 258118917
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
Version #5
addition of second rail track between Toulouse and Sète; source: Bing
- Edited by Peilscheibe
- Changeset #14949828
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
name | Chemin de Fer de Bordeaux à Sète |
note | Too long ! Need to be cut on stations |
railway | rail |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
26 nodes
- 772778990 (part of way 640000 (61980033))
- 2145845521
- 2145845523
- 258118930
- 258118929
- 258118926
- 2145848824
- 769334253
- 258118925
- 2145848821
- 2145848819
- 2145848817
- 258118923
- 2145848814
- 2145848812
- 258118921
- 2145848809
- 2145848807
- 258118920
- 2145848804
- 2145848802
- 258118918
- 2145848799
- 2145848797
- 258118917
- 258118916 (part of way Chemin de Fer de Bordeaux à Sète (96184096))
Version #4
addition of second rail track between Toulouse and Sète; source: Bing
- Edited by Peilscheibe
- Changeset #14949828
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
railway | rail |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
25 nodes
Version #3
addition of second rail track between Toulouse and Sète; source: Bing
- Edited by Peilscheibe
- Changeset #14949828
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
railway | rail |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
13 nodes
Version #2
+Ligne de Bordeaux à Sète as route=railway relation. gauge=1435 tagged on all railway=rail in the vicinity (hope that`s correct), electrification details, some uic_ref (IBNR) numbers for railway stations
Tags
electrified | contact_line |
---|---|
frequency | 0 |
gauge | 1435 |
railway | rail |
source | landsat / gps |
usage | main |
voltage | 1500 |
Nodes
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |