Loading...
Way: Southern Beltway (624758352)
Version #1
PA Turnpike 576 construction (section 55A1 to 55B)
Tags
bridge | yes |
---|---|
construction | motorway |
construction:surface | concrete |
fut_ref | PA 576 |
fut_ref:penndot | SR 7576 |
highway | construction |
lanes | 2 |
layer | 1 |
maxspeed | 70 mph |
name | Southern Beltway |
oneway | yes |
ref | PA Tpke 576 |
sidewalk | no |
toll | no |
Nodes
3 nodes
- 5899664358 (part of ways 624758487 and Southern Beltway (624758356))
- 5899664313
- 5899664357 (part of ways 624758487 and Southern Beltway (624758351))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |