Loading...
Way: Southern Beltway (626289363)
Version #1
PA Turnpike 576 construction (section 55C1-1 to 55C2-2)
Tags
fut_ref | PA 576 |
---|---|
fut_ref:penndot | SR 7576 |
highway | proposed |
lanes | 2 |
maxspeed | 70 mph |
name | Southern Beltway |
note | To remain highway=proposed until I-79-PA 43 segment starts construction; leave toll tag missing until future toll points confirmed |
oneway | yes |
proposed | motorway |
proposed:surface | concrete |
ref | PA Tpke 576 |
sidewalk | no |
Part of
1 relation
- Relation PA Turnpike 576 (930949) (as west)
Nodes
9 nodes
- 5912719055 (part of way Southern Beltway (626289364))
- 5912720715
- 5912720714
- 5912720713
- 5912720712
- 5912720711
- 5912720710
- 5912720709
- 5912719531 (part of ways 1026541459 and Southern Beltway (1026541460))
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |