Way History: 646970586
Version #14
https://www.openstreetmap.org/note/3617012
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 230 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský úpatní tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
wikidata | Q193002 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #13
Changed max speed to 250
- Edited by ManuelsWorld
- Changeset #136588934
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 250 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský úpatní tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
wikidata | Q193002 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #12
Regelwerk SBB I-30121: Strecke 533 5.3.7: Im GBT gilt Vmax 230 km/h. Ausgenommen sind Probefahrten.
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 230 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský úpatní tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
wikidata | Q193002 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #11
Gotthard Base Tunnel
- Edited by vojtechzaboril
- Changeset #111234864
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 200 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský úpatní tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
wikidata | Q193002 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #10
update maxspeed GBT, see https://www.openstreetmap.org/changeset/87237549
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 200 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #9
Maximum Speed in Gotthard Base Tunnel is 250 km/h
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 250 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #8
Reverting a very large changeset with (a) some dubious edits in it and (b) data from incompatible sources (wikipedia). See https://www.openstreetmap.org/changeset/83154874 and https://openstreetmap.org/changeset/86970496
- Edited by SomeoneElse
- Changeset #86987945
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 200 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #7
World explore+reply to request by other OSM mapper
- Edited by Cxioktsly0USVBswU8
- Changeset #86970496
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 200 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06-01 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:name:ja | ゴッタルドベーストンネル |
tunnel:name:zh | 聖哥達基線隧道 |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #6
World explore+reply to request by other OSM mapper
- Edited by Cxioktsly0USVBswU8
- Changeset #86970496
Tags
description | Currently World's longest railway and deepest traffic tunnel |
---|---|
electrified | contact_line |
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 200 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06-01 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:name:ja | ゴッタルドベーストンネル |
tunnel:name:zh | 聖哥達基線隧道 |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #5
Corrected max speed
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 200 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #4
maxspeed GBT
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 250 |
maxspeed:passenger | 200 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #3
Corrected max speed for Gotthard Base Tunnel (High-Speed Rail)
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 249 |
maxspeed:passenger | 200 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #2
service stations of Gotthard-Basis-Tunnel
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 200 |
maxspeed:proposed | 250 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Version #1
update Faido SMF
Tags
electrified | contact_line |
---|---|
frequency | 16.7 |
gauge | 1435 |
highspeed | yes |
layer | -2 |
maxspeed | 200 |
maxspeed:proposed | 250 |
operator | SBB |
passenger_lines | 2 |
railway | rail |
railway:etcs | 2 |
start_date | 2016-06 |
tracks | 1 |
tunnel | yes |
tunnel:construction_method | shield_tunneling |
tunnel:length | 57091 m |
tunnel:name | Gotthard-Basistunnel |
tunnel:name:cs | Gotthardský tunel |
tunnel:name:es | Túnel de base de San Gotardo |
tunnel:name:fr | Tunnel de base du Saint-Gothard |
tunnel:name:it | Galleria di base del San Gottardo |
tunnel:wikidata | Q193002 |
tunnel:wikipedia | de:Gotthard-Basistunnel |
usage | main |
voltage | 15000 |
Nodes
2 nodes
- 2096408012 (part of ways 199658000 and 646970587)
- 2096408019 (part of ways 199658001 and 199658003)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |