Loading...
Way: 674017101
Version #1
[Calamba, Laguna and Santo Tomas, Batangas] #DPWH_PPP #BuildBuildBuild #Meralco realign sections of future SLEX Toll Road 4, add/redraw possible rerouting of crossing roads, extend Meralco 115 kV line from Maibarara Geothermal
- Edited by TagaSanPedroAko
- Changeset #67705722
Tags
Nodes
6 nodes
- 5769361072 (part of way 609067931)
- 6312062848 (part of way 546350690)
- 5116568620 (part of way 546350690)
- 5116568619 (part of way 546350690)
- 5116568618 (part of ways 609067931 and 546350690)
- 5769361072 (part of way 609067931)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |